Basic
components of a public tender:
|
-
Request for a quotation, which should
contain the essential data as follows:
Location and date of the construction
project, type
of public tender (public, restricted...
etc.), developer, owner and supervision, deadlines
for submission of the bid and award.
|
-
Application conditions for participation
in the public procedure.
|
-
Conditions as per contract, like proof
certificates, payment conditions,
examination procedures... etc.
|
-
Additional
conditions - like
electronic rendering of invoices... etc.
|
-
Special
conditions - concerning social security,
occupation of foreign workers, subcontractors,
occupation of handicapped people or regarding
co-operations of bidders observance
of wage rates... etc.
|
-
Special
conditions - concerning supply and
disposal at the building site, shelters,
delivery of and safety regulations... etc.
|
Reconstruction
works:
|
-
Disassembly
and temporary storage of the inserted
sports apparatus.
|
-
Disassembly
and temporary storage of other
devices, like
skirtings, profiles, dorres and gates... etc.
|
-
Disassembly
and disposal of the existing sports floor,
including thermal insulation material, moisture
barrier... etc.
|
Preparation
of the underground:
|
-
Cleaning
and sealing
(as far as necessary) of the base floor.
|
Moisture
barriers:
|
-
Supply,
installation and welding of a multilayer moisture
barrier.
Vapor diffusion factor µ 1,250,000,
equivalent air layer thickness 620m...
etc.
|
-
Additional
installation works
and sealing of the moisture barriers around
acces panels for underfloor services or
sockets for sports equipment.
|
Levelling:
|
-
Preparation works for the levelling
of the sports floor.
|
Area-elastic WAGNER
sports floors, >>>
ES20 MXB >>>
DT 70/100 MXB >>>
DT 70/100 MX >>>
DT 70/100 V >>>
DS 100-V (or
equivalent):
incl.
substructure, thermal insulation, subfloor,
noise / vapor barrier - and load distributing
layer
|
-
Installation of the substructure.
|
-
Levelling
of the substructure.
|
-
If an underfloor heating is planned:
the
substructure must be prepared (lifted) for the installation of heating
pipes.
|
-
Supply
and installation of the thermal insulation
made of PUR-foam or other insulation
material (DIN / ISO / EN).
|
- If
an underfloor heating is planned:
For
hoisting the substructure, the thermal
insulation must be shifted (PU-foam) or
completely installed inbetween the double
beams.
|
-
Subfloor
|
-
PE-layer as a protection from noise
and and vapor barrier.
|
-
Load distributing layer - made of chip
board
or plywood (dends on type). With grooved
and tongued joint - screwed on subfloor
structure.
|
-
Additional installation
works to connect the substructure around
acces panels for underfloor maintenance or
sockets for sports equipment, pipes, columns and
alongside passages to other rooms.
|
Rigid
base course
for storage rooms:
incl.
substructure, thermal insulation, subfloor,
noise / vapor barrier - and load distributing
layer
|
-
Installation of a rigid subfloor
in storage rooms.
|
-
Levelling
of the rigid subfloor structure.
|
-
If an underfloor heating is planned:
the
substructure must be prepared (lifted) for the installation of heating
pipes.
|
- If
an underfloor heating is planned:
For
hoisting the sports floor the thermal
insulation must be shifted (PU-foam) or
completely installed inbetween the substructure.
|
-
Supply
and installation of the thermal insulation
made of PUR-foam or other insulation
material (DIN / ISO / EN).
|
-
Subfloor
|
-
PE-layer as a protection from noise
and and vapor barrier.
|
-
Load distributing layer - made of chip
board
or plywood (dends on type). With grooved
and tongued joint - screwed on substructure.
|
-
Additional installation
works to connect the substructure around
acces panels for underfloor maintenance or
sockets for sports equipment, pipes, columns and
alongside passages to other rooms.
|
LINOLEUM
/ PARQUET surface layers:
solid parquet and multi-layer sports parquet
|
-
Supply
and installation of the LINOLEUM
surface layer,
4mm mono-layer, direction and colour
after arrangement. Make DLW-LINODUR or equivalent.
|
-
Additional installation
works of surface layer around acces
panels for underfloor maintenance or sockets
for sports equipment, pipes, columns and
alongside passages to other rooms.
|
-
Fixing of the surface layer on the
covers for removable sections.
|
Sports
equipment, fixing devices... etc:
|
-
Supply
and installation of acces
panels for underfloor maintenance or sockets
for sports equipment.... etc.
|
Skirtings,
edgings and covers... etc.
|
-
Supply
and installation of ventilated
safety skirtings...
etc.
|
-
Supply
and installation of twin
chamber profiles alonside passages into
other rooms.
|
Court
markings:
|
-
Measure
and application of the court markings (dimensions
and colour due to the valid guidelines
of the sports associations - or according
to special arrangement).
Two-components
PU colour varnish - KIPP or equivalent.
|
Coating:
|
-
Coating of the surface with two-component transparent
varnish.
|
Cleaning
and prime maintance:
|
-
Cleaning
and prime maintance after finishing the
sports floor.
|
Hourly
rate for auxiliary work:
|
-
Hourly
rate for auxiliary work - after arrangement.
|